- Work order number and date
- Every RA bill is raised against a specific work order or letter of award. Quoting it lets the client's engineer match the bill to the approved BOQ and stops disputes over which contract a payment belongs to.
- RA bill sequence (RA-1, RA-2, Final)
- Civil jobs are billed in stages. Numbering each bill as a running account bill within your normal GST invoice series shows the client and the auditor how far the contract has progressed and which bill is the final one.
- Measurement book reference
- Quantities of excavation, PCC, RCC and brickwork are certified in the measurement book. Printing the MB page or joint measurement sheet number ties each line on the invoice to a quantity the site engineer has already signed.
- Previous, current and cumulative quantity
- Clients check that you are not billing the same cubic metre twice. A three-column layout showing up-to-previous, this bill and cumulative quantity makes the taxable value of the current bill easy to verify.
- Retention and advance recovery
- Most contracts hold back a percentage as retention and recover mobilisation advance in instalments. Showing these below the tax total, rather than reducing the taxable value, keeps GST calculated on the full contract value of the work done.
- Site address and place of supply
- For construction services the place of supply is where the immovable property is located. Printing the full site address, separate from the client's billing address, justifies charging CGST plus SGST of the site's state.