Skip to content

Construction and property

GST invoice format for an HVAC and air-conditioning contractor

An HVAC contractor's GST invoice should list each unit's make, model, tonnage and serial number, the ducting area, copper piping length, insulation, drain lines and controls, and separate supply of equipment from installation where they are separate contracts. Heating, ventilation and air-conditioning installation falls under SAC 995463. Air-conditioning machines under HSN 8415 moved from 28% to 18% in September 2025, so equipment, installation and ducting are now all at 18%.

Download this format free

Pre-filled with hvac contractor sample items and fields. No sign-up.

Or create these invoices in software, free

Sample hvac contractor invoice

DescriptionHSN/SACQtyRate (₹)Taxable (₹)GST
Ductable split AC 8.5 TR, inverter (equipment supply)84152 NOS2,65,000.005,30,000.0018%
GI ducting 24 gauge with 25 mm nitrile insulation, fabricated and installed995463160 SQM1,650.002,64,000.0018%
Copper refrigerant piping with insulation, installed99546370 RMT1,450.001,01,500.0018%
Inline ventilation fan with hood84144 NOS9,200.0036,800.0018%
Annual maintenance contract, 4 quarterly services9987191 OTH36,000.0036,000.0018%
Taxable value₹9,68,300.00
GST (CGST + SGST, or IGST if inter-state)₹1,74,294.00
Invoice total₹11,42,594.00

Sample prices are illustrative. Check the GST rate for your exact item or service before billing.

Extra fields a hvac contractor invoice needs

Tonnage and indoor/outdoor serials
Each AC has an indoor and outdoor unit with separate serials. Recording both, with tonnage, on the invoice is essential for manufacturer warranty registration.
Ducting area in square metres
Ducting is billed by sheet area of GI or aluminium used. Showing gauge and area per zone helps the consultant verify quantities.
Copper piping and insulation
Refrigerant piping length and size and insulation thickness affect efficiency. Listing them separately makes over-length charges visible.
Refrigerant type
R32, R410A and R134a are not interchangeable. Recording refrigerant type assists future servicing and environmental reporting.
Commissioning report
Commissioning records airflow and temperatures. Referencing the report on the final invoice ties payment to proof the system performs.
AMC period
Many installations are followed by an annual maintenance contract. Stating the AMC start and end dates on its invoice clarifies the service period.

Standard GST invoice fields

Rule 46 of the CGST Rules applies to every tax invoice, including this one:

  • Supplier name, address and GSTIN
  • Consecutive invoice number (max 16 characters, unique for the year)
  • Date of issue
  • Customer name, address and GSTIN (if registered)
  • Place of supply with state name
  • HSN/SAC code per item
  • Description, quantity and unit
  • Taxable value after discounts
  • GST rate and CGST + SGST or IGST amounts
  • Signature or digital signature

Read more: SAC Codes for Construction Services Under GST (Heading 9954) · GST Rates and Slabs in India: The Current Structure Explained · E-Way Bill Limit and Rules: When You Need One and When You Don't · Advance Payment Under GST: Receipt Vouchers, Tax and Adjustment

GST rules that matter for a hvac contractor

Air conditioners moved from 28% to 18%

Before 22 September 2025, air-conditioning machines under HSN 8415 were taxed at 28%. Notification 9/2025-Central Tax (Rate) now lists them in Schedule II at 18%, together with fans, ventilating hoods and compressors under 8414. HVAC contractors who quoted at 28% for supplies invoiced after that date should revise the bill; the rate applicable is the one in force at the time of supply, determined under section 14 rules where rate changes occur.

Equipment supply plus installation: composite or separate

Where a single contract covers supply of AC units and their installation with ducting and piping, the supply is a works contract if the system becomes part of the building, as with central or ducted systems, taxed at 18% under SAC 995463. For a split AC sold and installed in a home, the dominant element is the goods and installation is ancillary, making it a composite supply with the AC as principal supply. With equipment and installation both at 18%, the tax is the same, but the codes reported in GSTR-1 should reflect the actual nature.

Annual maintenance contracts

After the warranty period, AMCs are billed under maintenance and repair services, typically 998719, maintenance and repair of other machinery and equipment. If the AMC is paid annually in advance, GST is due when the payment is received or the invoice is issued, whichever is earlier, for the whole year. A comprehensive AMC that includes spare parts remains a service at 18%.

E-way bills for equipment

Ductable units and chillers are high value. Movement from your store to the site for a works contract requires an e-way bill when value exceeds ₹50,000. For direct dispatch from the manufacturer to the client's site on your order, the bill-to-ship-to arrangement must be reflected correctly in the e-way bill.

Place of supply for out-of-state projects

HVAC installation in a building is a service directly related to immovable property, so section 12(3) places the supply where the building is. For a Delhi contractor installing ducting in a Gurugram office, the place of supply is Haryana, not Delhi. Contractors with continuing site work in another state usually take registration there and charge the CGST and SGST of that state, and the site address on the invoice is the evidence for this. Equipment sold and shipped across states without installation follows the goods rules, where IGST applies on inter-state movement.

Common billing mistakes

  • Continuing to bill AC units at 28% after 22 September 2025.
  • Leaving out indoor and outdoor serial numbers, which blocks warranty registration.
  • Invoicing a full-year AMC at the end of the year instead of when the advance was received.
  • Reporting a central HVAC works contract under the goods HSN 8415 in GSTR-1.
  • Not showing ducting gauge and area, so the consultant cannot check quantities.

HVAC contractor GST invoice: FAQ

What SAC code is used for HVAC installation?

Heating, ventilation and air-conditioning equipment installation services fall under SAC 995463. Repairs to such installations come under 995469.

What is the GST rate on air conditioners now?

Air-conditioning machines under HSN 8415 are taxed at 18% from 22 September 2025, down from 28%.

Can a business claim credit on AC units?

Credit on movable AC units used for business is generally available. Central HVAC systems built into a building may be treated as part of the immovable property, where credit is blocked unless they qualify as plant and machinery.

What code should an AMC invoice use?

Maintenance and repair of machinery falls under group 99871; 998719 covers other machinery and equipment. AMC is taxed at 18%.

Do I need an e-way bill to send ACs to a site?

Yes, if the consignment value exceeds ₹50,000, even if the units are moving to your own project site.

How should I bill a replacement compressor during the warranty?

If the manufacturer supplies the compressor free under warranty and you fit it, no GST is charged to the client for the part. If you charge labour, issue a tax invoice at 18% for the labour only. Out-of-warranty compressors and refrigerant top-ups are billed with GST at the applicable rates.

Sources: CBIC — Notification 9/2025-Central Tax (Rate), 17 Sep 2025 · ICAI IDTC — Notification 9/2025-Integrated Tax (Rate) as corrected 18 Sep 2025 · PIB — Recommendations of the 56th GST Council (rate synopsis) · CBIC — Scheme of Classification of Services (SAC annexure)

More formats: Aluminium windows and glazing contractor · Architect · Borewell drilling contractor · Carpentry contractor · Civil contractor · Construction labour contractor · Construction project management consultant · Demolition contractor · all businesses

Book DemoClaim ₹9,999 Offer
Chat for offersReply in minutes on WhatsApp