- Drawing / work order number
- Fabricated structures are made to a client drawing. Printing the drawing number and revision on the invoice ties the billed tonnage to an approved design and settles later disputes over extra members, cleats or gusset plates.
- Billed weight basis
- State whether weight is theoretical (from section tables) or actual (weighbridge slip). Clients and auditors often reconcile the two, and the difference between them explains most quantity disputes in structural billing.
- Steel grade and section sizes
- Note grade such as E250 or E350 and the main sections used (ISMB, ISMC, angles, plates). It proves the material matches the specification the buyer paid for and supports their quality inspection.
- Surface treatment
- Mention primer coats, enamel painting or hot-dip galvanising and whether it is included in the per-kg rate. Galvanising done by an outside job worker is a frequent source of separate billing confusion.
- Delivery site and erection status
- Record whether the price is ex-works, delivered at site, or supplied and erected. Supply-plus-erection contracts can become works contracts for immovable property, which change the tax treatment entirely.
- Weighbridge slip number
- Large consignments are weighed before dispatch. Quoting the slip number lets the buyer match the invoice quantity to the e-way bill and the gate-entry record at their site.