Joinery fixed into the building
SAC 995476, joinery and carpentry services, sits under building completion and finishing in the SAC annexure. When you supply plywood, laminate and hardware and fix door frames, built-in wardrobes or panelling at site, the work becomes part of the immovable property, making it a works contract under section 2(119). The full value, including materials and labour, is taxed at 18%.
Plywood, doors and hardware rates
Notification 9/2025 puts plywood, veneered panels and similar laminated wood (4412), particle board (4410) and builders' joinery and carpentry of wood including doors and assembled flooring panels (4418) in Schedule II at 18%. Base-metal mountings and fittings for furniture and doors (8302) are 18% too. Bamboo building joinery is a notable exception in Schedule I at 5%, which applies only if you supply genuine bamboo joinery.
Workshop-made loose furniture
A study table or bed made in your workshop and delivered is a supply of goods under 9403, other furniture, at 18%. Furniture wholly of bamboo, cane or rattan is in Schedule I at 5%. Because loose furniture is movable, a business client may claim credit on it, while credit on fixed joinery is generally blocked. Billing them on separate lines helps the client and keeps your HSN summary in GSTR-1 accurate.
Owner-supplied plywood
Some owners buy plywood directly from a dealer to control quality, paying you only for labour and hardware. Your invoice then covers labour and the materials you supplied; the owner's plywood is not part of your value. Keep a record of sheets received and used, since unused sheets must be returned or accounted for.
Interstate timber and plywood purchases
Plywood often comes from another state. Your supplier charges IGST, which you can claim as credit against the CGST and SGST on your works contract invoices, after setting off IGST credit first as the law requires. Make sure the supplier's invoice shows your GSTIN and the correct state, otherwise credit fails to appear in GSTR-2B.
Site carpenters engaged on labour basis
Many carpentry contractors pay site carpenters per day and bill the owner a labour rate. If you are registered, your labour charges to the owner attract 18% under SAC 995476 whether or not you supply material. The carpenters you engage are your cost, not a separate supply to the owner, so do not list their individual wages as pass-through items. If a carpenter is himself a registered supplier and bills you, you can claim credit on his invoice against your output tax.